Pipe and Fabric

Hard to believe but it is only one more day to the Celebrate Christmas concert. Last night we began the process of getting the room ready for the event.

 

A team from Q Design was in to load the pipe and fabric. They finished their work by about 10:30pm.

 

Today we will load in all of the sound system, lighting system and multimedia equipment. With luck, we will have the systems installed and configured before the dress rehearsal tomorrow afternoon.

 

The team is looking forward to a terrific evening tomorrow. We look forward to seeing everyone tomorrow night at 7:00pm — the doors will open at 6:30 so come out early for best seating.

 

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>